The FKG Group was engaged by Armidale Dumaresq Council for the construction of a 600m taxiway as part of the Armidale Airport’s terminal upgrade. The airport expansion will ...
The Narrabri Shire Council engaged the FKG Group to complete the reconstruction of the Narrabri Airport runway after recognising the limitations of the airports infrastructure. The extension involved lengthening ...
The project involved stabilisation of the existing pavement material to a 250mm thick surface followed by an overlay of granular pavement material, then finished with a bituminous seal, line ...
The FKG Group was engaged to undertake four works packages for the rehabilitation of 12.9km of the Warrego Highway between Toowoomba and Dalby. Project works included road profiling, bulk ...
Fluor has been engaged to undertake an engineering, procurement and construction contract for the creation of upstream facilities in the Surat Basin. This forms part of Santos Ltd’s ...
Following the heavy rainfall events of early 2013, the FKG Group was engaged to undertake the repair and upgrade of a 2.5km section of flood-damaged pavement on Gatton Esk road ...
As part of efforts to reconstruct Toowoomba Regional Council’s road network and associated infrastructure following damaging flood events, the FKG Group was contracted to undertake pavement reconstruction and ...
The FKG Group was engaged to undertake the restoration of the Hughenden Airport runway, taxiway and an apron area, as well as full aeronautical ground lighting replacement. Works were ...
The Bum Bum Creek Bridge Project included the replacement of an existing timber bridge with a widened three-span prestressed concrete bridge on an improved horizontal alignment, as well as ...
Located on Drayton Street in the CBD of Nanango, Queensland, this project involved the demolition of an existing timber bridge and the installation of a new, three-span precast modular ...
The FKG Group completed the Gore Highway (Toowoomba to Millmerran) project as part of the Queensland Government’s TNRP Flood Restoration Program.
To complete the project, more than 455,000m² ...
As part of Santos Ltd’s GLNG coal seam gas venture, a need was identified to improve the road systems in and around the Fairview gas fields, near Injune ...