Location: | Cecil Plains and Millmerran, Queensland |
---|---|
Client: | Origin Energy Pty Ltd |
Status: | Completed October, 2011 |
Value: | $2.7 Million |
Capability: | Civil |
---|---|
Sector: | Resources |
Service: | Bulk Earthworks, Concrete |
Origin Energy engaged the FKG Group to carry out the construction of three large water-storage ponds as part of their Coal Seam Gas Pilot Ponds project. The initial two were the Gilbert Gully (Cecil Plains) and Waar Waar (Millmerran) pilot ponds which required a collective 75,000m³ of earth to be excavated. Both jobs required additional installation of subsoil drainage filters, stock fencing and roadways around the dam walls.