Location: | Archerfield, Brisbane, Queensland |
---|---|
Client: | Hastings Deering |
Status: | Completed June, 2012 |
Value: | $12 Million |
Capability: | Construction |
---|---|
Sector: | Industrial, Retail and Commercial |
Service: | Construct Only |
Hastings Deering contracted the FKG Group to refurbish an existing office. Works included alterations to two separate areas; the 2,000m² office space and the 6,000m² warehouse. The existing office space required structural alterations to the roof and walls to create an improved workspace with an open-plan office. In addition to this, the construction of lunchrooms and training rooms took place on the upper level, while the downstairs area was designed as a showroom and workshop area.
This project utilised various green design elements, including the use of Kingspan cladding and tinted glazing to the building facade to improve thermal efficiency.